Turramurra·Ku-ring-gai Council

Turramurra · Knockdown Rebuild (KDRB) Custom Mansions

14 applications for new dwellings lodged together with demolition with a Turramurra address were lodged on the NSW Planning Portal between 1 November 2025 and 19 November 2026. 79% went through complying development (CDC) with a private certifier; the rest were development applications (DAs) to Ku-ring-gai Council. The median cost declared at lodgement was $1.3m.

Talk to a Hillside architect:Call 02 8413 8558info@hillsidearchitects.com.au

Other Hillside residential projects

Feasibility & Cost Estimator

2026 Sydney Cost Benchmarks & Council Diligence

450 ㎡
150 ㎡550 ㎡1,000 ㎡
Site Constraints
Site Slope & Sandstone
Turramurra · Ku-ring-gai
$2,044,680 – $2,963,968
Estimated Total Project Cost (AUD)
Rate / sqm$4,544 – $6,587
Approval PathwayComplying Development (CDC)
Design & ApprovalsSee local Planning Portal data below
Construction56 wks
Model Benchmark: Hillside Internal Architectural Cost Model (Based on 2026 Sydney construction indices & past project completions)Regional Cost Factor: 1.08x (Upper North Shore)

Statutory Disclaimer: This calculator provides preliminary architectural feasibility ranges based on Hillside delivery benchmarks and 2026 Sydney construction indices. Assumptions: Turnkey base build handover, including standard MEP services and hard finishes; excludes specialized art installations or franchise licensing fees. Final budgets are subject to site survey and an itemized Bill of Quantities (QS/BoQ) by a registered architect.

NSW Planning Portal data

Recent Turramurra applications for new dwellings lodged together with demolition

Applications lodged 1 Nov 2025 – 19 Nov 2026.

Applications lodged
14
3 DA · 11 CDC
Median declared cost
$1.3m
middle half $820k–$1.5m · n=14
Median DA decision time
—
fewer than 5 decided (n=3)
Went through CDC
79%
complying development instead of a council DA · n=14

Source: NSW Planning Portal open data (Online DA and Online CDC), NSW Department of Planning, Housing and Infrastructure, retrieved 19 Nov 2026. Counts include only applications lodged through the Portal with a Turramurra address; repeat lodgements of the same project are counted once. Declared cost is the applicant's estimate at lodgement, not a final contract price, and covers the whole application; values under $5,000 are treated as placeholders and left out. Individual applications are not listed for houses.

Turramurra · Knockdown Rebuild (KDRB) Custom Mansions: questions

Do new dwellings lodged together with demolition in Turramurra usually need a DA?
Not usually, going by recent lodgements. Of 14 applications for new dwellings lodged together with demolition with a Turramurra address since November 2025, 79% were complying development certificates (CDC) and 21% were development applications to Ku-ring-gai Council. Whether your site qualifies for CDC depends on its zoning, any heritage listing and the works; check the address on the NSW Planning Portal Spatial Viewer.
What do new dwellings lodged together with demolition in Turramurra declare as their cost?
Applicants in Turramurra declared a median cost of $1.3m (middle half $820k to $1.5m, 14 applications since November 2025). Declared cost is the applicant's own estimate when lodging and covers the whole application, so treat it as a rough local reference. The estimator on this page gives a range for your floor area and finish level.
How does Turramurra compare with nearby Ku-ring-gai Council suburbs?
The median declared cost in Turramurra ($1.3m) is higher than the $1.1m median for Lindfield, Killara, Gordon, Pymble, Wahroonga, Roseville combined (64 applications with a cost since November 2025). 79% of Turramurra applications went through CDC, against 59% in those suburbs. Those are the other Ku-ring-gai Council suburbs this site has NSW Planning Portal data for, not the whole council area.